News Header

Implement CE requirements

01.12.2009

implement CE-requirements

The final start of the CE requirements is soon, so we want to remind you of three important facts.

  1. The CE requirements can be implemented with our versions 6.8 and 7.0
  2. The special manual on CD shows how to do. If you put in the CD the autostart will show the homescreen. There you can choose the manual (If autostart is deactivated you can choose it manually by clicking on „_readme.HTML")
  3. The U-value-calculation bears no relation in germany- it's no obligation! It is just a possibility to print a calculated value.

You can print positions list with both version for the WPK. You can do many things with these information:

  • Failure analysis at order
  • Complainmentfrequency and -way to certain customers
  • Failurefrequency during a certain period or at a determined working station
  • Analyse various failures

 

However, information have to be set up in right way- in a database. Pretty good would be to organize the WPK in electronical way directly. Then a analysis is possible with only one click:

  • In case of dispute you can get a analysis with all failures in PDF format. The failures have to be archived for 5 years.
  • Failure tendency at determined working stations. It's possible to realize failures which come up often. Especially when the type of failure is seperated, for example 2- or 3- sheet glass.

tl_files/Klaes_Data/News/DE/2009-11/PruefungSchweissen_800.jpg

You will find further information to Klaes e-prod at the sales department

 

 

 

 

 

 

Go back

Klaes World Logo

1500 terrace roofs

“Heim&Haus” now steers a Elumatec SBZ with Klaes 3D and EluCad. The Company produces with own alu systems about 1500 terrace roofs a year.

Trennlinie

Bushfire proof windows

An Australian specialist in window construction works with Klaes professional and e-control now. Two brothers were three weeks on training in Ahrweiler.

Trennlinie

Version 7.3 ready to deliver

The annual update Version 7.3 is ready. In a pre-delivery stage the version has been installed in more than 20 companies and the software test checked in real time.

Trennlinie